Finaly after a long rain season the constructors could start with the renovation of the roof. All the roof tiles have to be removed and replaced with alluminium tiles, but also the water tank has to be replaced from the roof to a free standing construction. When all the outdoor work has been done, then the ceilings can be fixed again.

Please check the photos page for all images of the renovation.